For an industrial owner considering solar in Dong Nai, provincial planning information is a starting point for due diligence. It does not confirm that a particular roof, connection point or commercial structure is eligible to proceed. The project team needs a current evidence file for the actual site.
Establish the legal and physical site
Record the current address, administrative jurisdiction, roof or land rights and the parties that will own and operate the installation. Distinguish rooftop self-consumption from projects developed on land or for electricity sales. These choices affect which requirements the team must assess.
Use the applicable planning document
For any quoted capacity allocation or project list, retain the decision, relevant appendix, issue date and subsequent amendments. An old regional total does not demonstrate remaining development capacity. Confirm the relevance of each planning requirement to the proposed project type before relying on it in an investment memorandum.
Assess the actual connection
Regional transmission infrastructure or a count of substations cannot prove that a factory connection can accept the proposed plant. Review the site’s single-line diagram, transformer ratings, operating loads, protection, metering and expected export behaviour. Resolve connection requirements with the responsible electricity entity as applicable to the project.
Keep units explicit: DC PV capacity in kWp, AC power in kW, transformer apparent power in kVA or MVA and connection voltage in kV. Energy yield in kWh requires a site-specific resource and loss model.
Complete roof and load due diligence
Available structural records and an assessment of the proposed mounting loads.
Roof condition, waterproofing responsibility, shading and access constraints.
Interval load data, operating shifts and production shutdowns.
Existing generators, protection arrangements and required control interfaces.
Construction, fire-safety and operating constraints applicable to the facility.
Separate verified facts from investment scenarios
State the source and date of resource, load and cost inputs. Treat unresolved permissions, grid conditions and commercial terms as open items. Do not infer a historic FIT entitlement or a common FIT expiry date for all projects. Revenue from electricity sales belongs in the investment case only when the project-specific eligibility and agreement are established.
Use the findings to define the EPC enquiry
The enquiry should identify the available evidence, technical boundaries, unresolved surveys and the decision required from each party. Obtain comparable proposals against this scope, with storage treated as a separate operating and integration option if required.
Confirm the applicable self-consumption or power-sale model, connection arrangement, notification or registration route, and any licensing requirements or exemptions for the actual project. Building, structural, environmental and fire-safety obligations require a separate project review. Zero-export control does not by itself establish regulatory compliance. Do not include a historic FIT, surplus-energy revenue or a subsidy in the base case without evidence of eligibility and the applicable agreement.
Editorial review: 26 October 2026. This guide supports project preparation and estimate review; it is not a binding commercial quotation or project approval.
[contact-form-7 id="7239967" title="Contact form 1"]
Related Posts
Fleet Charging Service Levels: Prove Departure Readiness
Define fleet charging service levels around verified departure readiness, critical charging windows, evidence quality and [...]
Corporate EV Depot Electrical Brief: Supply, Interfaces and RFQ
Prepare a corporate EV depot electrical brief for Vietnam: qualify supply capacity, energy boundaries, control [...]
Oct
Transformer Substation Construction Quote: Cost Components & Key Cost Drivers
Guidance for breaking down a transformer substation construction quote: main cost groups and the common [...]
May
Substation Solutions for Factories: Investing and Implementation Strategies
Overview of factory substations: when to invest, key components, execution processes, documentation, and selecting the [...]
Apr
Transformer Repair in Ho Chi Minh City: When Immediate Action Is Required
Discover signs of transformer damage, diagnostic methods, on-site handling processes, and criteria for selecting repair [...]
Apr
Transformer Repair: Process, Diagnosis, and Decision-Making
Hướng dẫn sửa chữa máy biến áp cho nhà máy: nhận biết dấu hiệu hỏng, [...]
Apr
24-Hour Transformer Repair: Efficient Solutions and Reliable Power Restoration
Khung xử lý sửa chữa máy biến áp 24h cho nhà máy: nhận biết sự [...]
Apr
Common Mistakes in Transformer Station Construction Leading to Extra Costs
Các sai lầm khi làm trạm biến áp thường không nằm ở một hạng mục [...]
Apr
Comprehensive Guide to Acquiring Used Transformers
Góc nhìn kỹ thuật về thu mua TBA cũ: cách đánh giá hiện trạng, hồ [...]
Apr
Comprehensive Transformers Maintenance for Industrial Plants
Tổng quan dịch vụ bảo trì trạm biến áp nhà máy: lịch bảo dưỡng, thí [...]
Apr
Transformers: Assessing and Safely Handling Used Transformers
Khung đánh giá máy biến áp cũ theo tình trạng kỹ thuật, dầu cách điện, [...]
Apr
How Proactive Transformer Maintenance Minimizes Business Risks
Nhìn từ góc độ vận hành nhà máy, bảo trì chủ động trạm biến áp [...]
Apr
Comparing Oil and Dry Transformers in Industrial Projects
Distinguish between oil and dry transformers based on installation site, safety, maintenance, energy losses, initial [...]
Mar
Electrical Overload Warning Signs in Factories
Recognize early indicators of factory electrical overload such as voltage drops, overheating equipment, circuit breaker [...]
Mar
Risks of Overloading Industrial Transformers Without Upgrades
Keeping the same low-voltage transformer while increasing factory loads can result in overheating, insulation degradation, [...]
Mar
Evaluating and Implementing Transformer Contractors in Tay Ninh
Criteria for selecting transformer substation contractors in Tay Ninh, EPC scope, and factors affecting project [...]
Mar
Comparing Oil and Dry Transformers for Industrial Applications
Examine oil and dry transformers based on installation location, fire safety, maintenance, energy loss, investment [...]
Mar
Comprehensive 1500kVA Transformer Station Budget for Manufacturing Facilities
Guidance for creating a detailed budget list for a 1500kVA transformer station, including medium voltage [...]
Mar
Comprehensive Transformer Station Pricing: Elements and Considerations
Examine key components in comprehensive transformer station pricing including design, equipment, construction, testing, and connection [...]
Mar
Pricing Guide for 4000kVA Transformer Stations: Configuration, Cost, and Investment Process
An overview of configuration, cost estimates, connection approaches, and investment checklists for 4000kVA transformer stations [...]
Mar