Available connection capacity
Demand assessment, transformer upgrade options, point-of-connection and utility coordination.
A reliable charging installation starts with feeder capacity, protection coordination, distribution architecture and charger interface requirements. QuangAnhcons can support the electrical works and agreed vendor interfaces.
Technical scope, construction boundaries and commercial terms confirmed per project.
Conceptual engineering illustration, not a photograph of a completed installation.
For depots, industrial facilities and commercial charging sites, early engineering needs to consider simultaneous charging demand, LV/MV capacity, charger location, distances, demand management and availability of a utility connection. Equipment supply, software, billing, remote monitoring and operator obligations must be explicitly allocated.
Demand assessment, transformer upgrade options, point-of-connection and utility coordination.
MSB/DB, protection, voltage drop, conductor routing, containment and distribution interface.
Charger configuration, site layout, foundations, distribution and vendor installation requirements.
Protective devices, required fault rating, earthing/bonding, isolation and physical protection.
Power sharing, metering, monitoring and utility export/import control where applicable.
Inspection plan, electrical tests, charger vendor checks and site operation documentation.
Count chargers, rated kW, concurrency, dwell-time and expansion plan.
Verify transformer/feeder loading, available spare capacity and utility limits.
Agree charger make/model, control network and commissioning responsibility.
Complete electrical construction checks and agreed functional handover.
Questions often raised during a preliminary engineering and commercial review.
That cannot be determined from the nameplate figure alone. Simultaneous load, power factor, losses, other site demand, diversity strategy and expansion assumptions must be checked.
Yes, the vendor charger package and site electrical scope can be clearly separated in the RFQ.
No. The graphic is an engineering concept, not a claim that a pictured EV charger site was delivered by QuangAnhcons.
These interfaces can be evaluated at concept stage, subject to operational profile, control scheme, protection and separate scope confirmation.
Send the location, technical ratings, SLD or BOQ if available, target dates and expected supply/installation boundaries. The quotation will identify assumptions and exclusions.