Roof and site constraints
Available area, existing penetrations, shade, access, fire routes, roof condition and loading assumptions.
Buildable PV projects depend on safe roof access, validated electrical architecture, grid-interface protection and a clear construction scope—not simply a nominal kWp figure.
Technical scope, construction boundaries and commercial terms confirmed per project.

QuangAnhcons supports industrial rooftop solar work packages, with particular attention to DC/AC electrical installation, inverter interfaces, factory MV/LV integration, protection and commissioning coordination. Structural design, required authorisations and commercial energy assumptions must be assigned to the appropriate qualified parties.
Available area, existing penetrations, shade, access, fire routes, roof condition and loading assumptions.
Module/string concept, inverter selection, DC/AC cable paths, voltage and collection strategy.
Tie-in location, LV/MV capacity, fault/protection coordination, export limits and plant operating profile.
Cable routes, containment, DC/AC distribution, earthing and protection installation.
Isolation, insulation, continuity, polarity, protections and quality documentation per approved procedure.
Space, metering and control provisions for possible storage or energy management integration.
Validate roof, utility interface, electrical rooms, cable access and equipment locations.
Align proposed DC kWp and AC kW with load, inverter capacity and roof limitations.
Install to approved design, check interfaces and record quality evidence.
Complete defined tests, protection interface checks and handover documents.



Questions often raised during a preliminary engineering and commercial review.
An indicative tool can derive a capacity range using verified area, packing assumptions and exclusions. Final DC sizing requires a roof survey, structural review and equipment selection.
No. Budget pricing and generation modelling are different deliverables; a formal energy yield study must state its assumptions, weather dataset and loss factors.
Not unless agreed. Storage power, duration, EMS control, fire safety and grid requirements require a separate scope.
These responsibilities are documented in the agreed design and construction scope with the relevant qualified parties.
Send the location, technical ratings, SLD or BOQ if available, target dates and expected supply/installation boundaries. The quotation will identify assumptions and exclusions.
Hotline: +84 919 758 191
From electricity needs to a preliminary system and budget. No contact details required.
Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.
Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.