Discover the Nhon Trach Industrial Park Electrical Contractor: Projects and Advanced Technology



The Samsung C&T Corporation – LILAMA consortium is the main contractor under the EPC contract for the Nhon Trach 3&4 Power Plant Project with a total capacity of 1,500 MW, utilizing General Electric’s cutting-edge technology.

Nhon Trach 3&4 Power Plant Project

The Nhon Trach 3&4 Power Plant Project, executed by the Samsung C&T – LILAMA consortium, represents the electrical contractors for Nhon Trach Industrial Park. Engaged in an EPC contract valued over $940 million, the project boasts a total capacity of 1,500 MW. The consortium ensures the design, procurement, and construction, implementing General Electric’s high-efficiency gas turbines, reaching up to 64% efficiency.

Strategically located at Phuoc Khanh commune, Nhon Trach district, Dong Nai province, this pivotal project draws a total investment of $1.4 billion. As a key enterprise of PetroVietnam Power Corporation (PV Power), it’s poised to be Vietnam’s inaugural LNG-based project.

Location and Scale

With a generating capacity between 1,500 and 1,624 MW, divided into two units, the plant is expected to significantly boost national electricity output, potentially reaching 9 billion kWh annually. Emphasizing LNG as a cleaner, lower-emission alternative to coal, the project spearheads the transition to sustainable energy.

Progress and Contracts

Highlighted project milestones include:

  • Expected commissioning of Nhon Trach 3 by January 2025.
  • Securing an electricity purchase agreement with EVN EPTC on October 4, 2024, to ensure commercial electricity output.
  • Finalizing a stable gas supply contract with PV GAS.
  • Integration with the national grid via a 500 kV transmission line.

Technology and Efficiency

The Nhon Trach Power Plant embraces advanced gas turbine technology from General Electric (GE), recognized for its peak efficiency, optimizing performance and enhancing competitive edge in regional power systems.

Strategic Role

This power station is crucial in enhancing stable energy supplies, reducing reliance on traditional energy sources like hydropower and coal-fired power. The project promises substantial socio-economic benefits, propelling industrial growth in Dong Nai and the Southeastern region.

Challenges and Future Directions

Project challenges include funding arrangements and operational management. Furthermore, the project’s power purchase agreement (PPA) serves as a crucial model for future LNG projects under the national Power Development Plan VIII.

The success of the Nhon Trach Power Plant symbolizes progress not just for the energy sector but also showcases adaptability and technological advancement amid Vietnam’s energy transformation.

Nhon Trach 3&4 Power Plant construction site

Nhon Trach 3&4 Power Plant under the construction of Samsung C&T and LILAMA.

Electrical and Transmission Systems at Nhon Trach Industrial Park

The grid infrastructure, facilitating the plant’s power evacuation, has been developed by the Vietnam Electricity National Transmission Corporation (EVNNPT). Key projects include the 220kV Nhon Trach 3 – My Xuan – Cat Lai transmission line, supervised by NPT’s Power Transmission Project Management Board to ensure timely completion and support for the Nhon Trach power plant’s load evacuation.

The power system at Nhon Trach Industrial Park is pivotal in stabilizing economic activities in Dong Nai. Efficient power supply and management are essential for sustainable industrial growth in this area.

  • Power Supply: Connected to the national grid via substations like the 110/22kV Tuy Ha station and the 110/22kV Nhon Trach Industrial Park V station, the system provides stable voltage across the region. These stations are strategically significant, ensuring Nhon Trach’s electrical capacity meets standards.

  • Operational Management: IDICO – UDICO manages two main substations, totaling 418 MVA, guaranteeing continuous and safe system operations.

  • Power Distribution to the Industrial Park: Nhon Trach Industrial Park 1 receives power from the 110/22kV Tuy Ha substation, with a capacity of 182 MVA, linking from the 220kV Nhon Trach station to Long Binh, assuring reliability for businesses.

Transmission and Infrastructure

  • Electrical Infrastructure: Modern insulated cables minimize outages and ensure system safety, with equipment undergoing regular maintenance and testing.

  • Renewable Energy Sources: Nhon Trach Industrial Park 3 is advancing its solar energy initiatives, including rooftop solar solutions for businesses, partnered with experts like Xenon Solar Light.

Integration Capabilities

  • Integrating with the national grid, Nhon Trach’s power system supports local businesses’ significant production demands. Optimizing the Nhon Trach grid exemplifies the cohesive and sustainable growth of the industrial park.

Transmission lines at Nhon Trach

220kV transmission lines at Nhon Trach.

Equipment and Technology in the Nhon Trach Project

Key project equipment includes gas/steam turbines and generators supplied by General Electric. Additionally, DCS control systems are installed to optimize operational efficiency, ensuring quality and safety in electricity production.

The Nhon Trach project exemplifies the integration of modern technology in Vietnam’s construction and energy sectors, notably in the Nhon Trach power plant. The project’s focus encompasses large-scale mixed-use urban areas and power plants utilizing EPC technology to streamline all processes from design to operation.

Mix-Use Project

The Nhon Trach mixed-use development (XDHN) comprises three main sections over 150.65 hectares with 25 high-rise apartment blocks and 8 mid-rise blocks. Specific construction equipment details are yet to be revealed, but with the adoption of cutting-edge building technology, the project is expected to ensure top quality and construction pace.

Nhon Trach 3&4 Power Plant

With a robust capacity of 1,500 MW, the Nhon Trach 3&4 power plant is projected to contribute approximately 9 billion kWh of electricity annually. Located in Phuoc Khanh commune, Nhon Trach district, Dong Nai province, the plant is under construction via an EPC tender. As of July 2024, the project is 91.6% complete, marking significant progress.

Core systems like DCS (Distributed Control System) optimize operations and ensure safety and quality control. Gas turbines and generators are vital components aimed at enhancing plant performance.

Technological advancements and modern equipment, particularly from leading brands, are greatly supporting this project’s deployment. Utilizing a synchronized DCS system with turbine units not only enhances operational efficiency but also guarantees superior quality.

Through the robust application of EPC technology, the Nhon Trach project establishes a strong foundation for sustainable and efficient growth in the energy sector.

General Electric turbines at Nhon Trach

GE H-Class turbines at Nhon Trach Power Plant.

The Nhon Trach 3&4 Power Plant Project not only delivers exceptional technical benefits, with large capacity and new technology from General Electric, but also ensures effective energy transmission in the region, driving sustained economic development.