Enhancing electrical systems is crucial amid increasing energy demands, aiming for efficiency, safety, and the integration of renewable energy.
Demand and Objectives of Electrical System Upgrade
To support economic and energy growth, national electrical systems must be upgraded. Traditional energy sources like coal are becoming limited, while renewable sources such as wind and solar are prioritized for integration. By 2030, the goal is to enhance system flexibility to effectively integrate renewable sources, boosting capacity to maintain grid stability. This solid foundation ensures sustainable energy development.
Vietnam is entering a phase of rapid electricity demand growth, necessitating comprehensive system upgrades. Economic growth predicts a 1.5% increase in electricity for every 1% economic growth. By 2025, electricity output is expected to reach 347,509 billion kWh.
Implementing the Power Plan VIII is crucial, with a target to reach national capacity of 150 GW by 2030. This involves integrating renewable sources and boosting thermal power flexibility to stabilize when adding renewables.
Meeting rising electricity demands requires significant investment in power generation and transmission projects. From 2021 to 2030, the projected investment totals approximately 134.7 billion USD, with 119.8 billion USD dedicated to sources and transmission networks. Accelerating current projects and planning new ones is essential for increasing generation capacity.
Ultimately, system flexibility will optimize renewable energy use, reducing reliance on traditional sources. These investments ensure current demands are met and lay the groundwork for a sustainable future.

Electrical Upgrade Projects in Vietnam
In Ho Chi Minh City, the Power Corporation is fast-tracking grid upgrade and refurbishment projects, aiming to operate 10 new projects by the end of 2024. Nationwide, the target is to provide electricity to 20,520 households, including upgrading 8,966 households to safe systems by 2025. These projects are designed to ensure 99.5% of households have electricity, driving economic growth and improving living standards.
2024-2025 marks a significant advancement in Vietnamese electrical upgrades, with key projects underway. These projects focus on optimizing the grid while ensuring national system safety and stability.
110kV-500kV Grid Projects
Projects ranging from 110kV to 500kV are actively being deployed. In early 2025, 37 projects commenced, and 57 completed and electrified. The main goal is to enhance transmission capacity and minimize energy losses, effectively meeting load demands in key regions.
LNG Nhon Trach 3&4 Project
Located in Dong Nai, the LNG Nhon Trach 3&4 project is under active construction, expected to commence before 2025. This project, incorporating LNG and natural gas-turbine cycles, diversifies energy sources and boosts operational flexibility of the national grid.
500kV North-South Project
This project focuses on accelerating 500kV line segments, especially in Vinh Phuc where land clearance compensation presents challenges. Despite this, the goal is to complete by June 30, 2025, remains paramount.
National Electric System Operation Plan
According to Decision 3047/QD-BCT issued on November 15, 2024, enhancing load monitoring and renewable integration is a top priority. This is crucial during peak months from April to July 2025, to maintain system safety through contingency planning.
Natural Disaster Response in Operations
Proposed solutions include developing flood and landslide emergency scenarios in the Northern and Central mountainous regions. Real-time load forecasting is applied to ensure supply-demand balance, mitigating disaster-related risks.
Vietnam’s electrical upgrade projects from 2024 to 2025 target not only infrastructure quality improvement but also lay the foundation for national system sustainability.

Developing Electrical Infrastructure and System Flexibility
Over 15 years, EVNNPT has invested significantly in 500 kV and 220 kV transmission projects, essential for stable power supply. Power development planning emphasizes cleaner energy sources, excluding new coal project proposals. System flexibility is key, especially for integrating offshore wind and solar power, projected to be operational by 2029-2030. This is a major step in creating a flexible and sustainable electrical system.
Vietnam is advancing electrical infrastructure development to enhance system flexibility and sustainability. According to Power Plan VIII, key targets have been set for significant transformation. By 2030, the electrical system aims for a total capacity of about 146,000 MW to meet growing electricity demand and maintain national energy security.
In this effort, developing transmission networks is essential. 500kV and 220kV projects are vigorously pursued to alleviate power plant capacity. This enhances reliability and reduces energy loss. By applying N-1 and N-2 criteria in critical load areas, system stability is notably increased.
Infrastructure isn’t limited to transmission development; smart grid construction is underway. By employing advanced technology, Vietnam’s electrical system can integrate renewable sources like wind and solar, ensuring economic operation and meeting dynamic load demands. Infrastructure for gas, particularly LNG import and storage, is also developed for effective utilization in gas-powered plants.
Integrating renewable sources not only enhances flexibility but also reduces fossil fuel dependency, aligning with Vietnam’s COP26 commitments. To actualize this, substantial land development needs were identified: approximately 89.9 – 93.36 thousand hectares for 2021-2030, increasing to around 169.8 – 195.15 thousand hectares subsequently.

Upgrading Vietnam’s electrical systems not only improves electricity supply but also opens opportunities for renewable energy integration, promoting economic growth and environmental protection. This is a long-term strategic move ensuring sustainability and system flexibility.
Contact QuangAnhcons today via Hotline: +84 9 1975 8191 to learn more about electrical system upgrade services and renewable energy solutions.
QuangAnhcons provides consulting and implementation of electrical system upgrades, focusing on grid refurbishment and renewable energy integration to help clients achieve optimal energy management and sustainable usage.
Related Posts
Investment Costs and Expansion Opportunities for 120kW EV Charging Stations
Investigate the investment costs for a 120kW EV charging station to maximize benefits and expansion [...]
Aug
QuangAnhcons: Comprehensive Electrical Contracting Solutions for Modern Systems
Discover QuangAnhcons' solutions for efficient industrial electrical systems, high-performance substations, and innovative renewable energy projects. [...]
Aug
Quanganhcons: Innovative Solar Energy Solutions Contractor
Discover Quanganhcons' optimal solar energy services, from design to installation, for sustainable solutions. [...]
Aug
Optimized Cleaning Procedures for Electrical Equipment in Factories
Explore efficient cleaning procedures for factory electrical equipment to ensure safety and extend longevity. [...]
Aug
Comprehensive M&E Services by QuangAnhcons
Discover QuangAnhcons's extensive range of M&E services that ensure quality and cost optimization for every [...]
Aug
Comprehensive MEP Contracting and Its Role in Construction
Explore how comprehensive MEP contracting optimizes electrical and mechanical systems. [...]
Aug
What Investors Should Know When Hiring an HVAC Contractor
Explore effective criteria and processes for selecting an HVAC contractor. [...]
Aug
Comprehensive M&E Solutions for Industrial Electrical Systems by QuangAnhcons
Explore QuangAnhcons' M&E solutions designed for sustainable and safe industrial electrical systems. [...]
Aug
QuangAnhcons’ Electrical Installation Services and Sustainable Strategy
Discover QuangAnhcons - your partner for comprehensive electrical installation and sustainable energy solutions. [...]
Aug
Comprehensive Solar Energy Solutions from QuangAnhcons
Explore QuangAnhcons' comprehensive solar solutions with unmatched service and monitoring. [...]
Aug
Quanganhcons: Comprehensive Solar Solutions Provider
Discover comprehensive solar solutions with Quanganhcons, a trusted provider of sustainable energy systems. [...]
Aug
QuangAnhcons Solar Solutions: Comprehensive Sustainable Energy Provider
Discover sustainable energy solutions from QuangAnhcons, a professional solar energy contractor. [...]
Aug
Expertise in Substations with Quanganhcons: Comprehensive and Effective Solutions
Discover modern services, advanced technology, and optimal solutions from Quanganhcons. [...]
Aug
Investment Costs for VinFast Charging Stations and Partnership Opportunities
Explore the investment costs and opportunities for VinFast charging stations alongside optimal support strategies. [...]
Aug
Investment Costs for EV Charging Stations: Key Factors and Long-Term Benefits
Discover the investment costs of electric vehicle charging stations and influencing factors. [...]
Aug
QuangAnhcons: Trusted Partner for Industrial Electrical Systems
Discover QuangAnhcons, a trusted partner for efficient and safe industrial electrical solutions. [...]
Aug
Expert Transformer Repair Services by Quanganhcons in Đắk Lắk
Explore premium transformer repair services by Quanganhcons. [...]
Aug
Reliable and Efficient Transformer Repair Services in Lam Dong by Quanganhcons
Explore Quanganhcons' transformer repair services in Lam Dong to ensure efficiency and stability. [...]
Aug
Professional Transformer Repair Services in Can Tho – Quanganhcons
Quanganhcons in Can Tho provides expert transformer repair and construction services. [...]
Aug
Professional Transformer Repair Services in Vinh Long by QuangAnhCons
Discover QuangAnhCons' transformer repair services in Vinh Long, ensuring top CO, CQ standards! [...]
Aug