Solar Electrical BoP & Industrial Power Integration in Vietnam

Connect the solar electrical package to the industrial power system with clear AC work limits, installation responsibilities and handover records.

For industrial rooftop and other solar enquiries with an agreed AC electrical scope.

QUANGANHCONSPACKAGE SCOPE
Define the
AC boundary first
Starting pointAgreed AC terminals
DistributionCable + switchboard
MV/LV interfaceStation + connection
HandoverTests + records
Scope and decision owners are agreed for each project.
SLDAC worksInterface
Illustrative package layout. Final deliverables follow the agreed scope.
Developers & FDI ownersEPC contractorsIndustrial project teamsProjects in Vietnam

A defined assignment

When the solar EPC needs a defined electrical work package

QuangAnhcons assesses the AC electrical balance-of-plant scope against your SLD, BOQ and factory connection requirements. Rooftop solar is one application of this package; module installation, DC works and a full solar EPC contract are not assumed from an AC enquiry.

01

A rooftop solar EPC package

Allocate the AC cables, distribution equipment, earthing and connection points between the solar and factory teams.

02

An MV/LV or substation interface

Clarify the agreed section of the incoming/outgoing system and the related inspection and connection documents.

03

A factory that continues operating

Align work access and proposed outages with the site operator before mobilisation.

Outputs to agree

AC installation outputs that match the SLD and BOQ

Supply responsibilities and specialist activities are itemised before the scope is accepted.

01

AC cable works

Containment, cable installation and terminations from the agreed starting point.

02

Distribution interfaces

Boards and electrical connection work explicitly included in the contract.

03

Earthing and bonding

Agreed installation items according to the approved electrical design.

04

MV/LV connection scope

Substation and grid/factory interface items where separately identified in the BOQ.

05

Inspection coordination

Work records and coordination with the appointed testing and protection specialists.

06

Electrical handover

As-built information, material/equipment documents and open-item records for the executed scope.

Agree the boundaries

What the assignment covers

Within the agreed package

  • Defined AC electrical works against approved drawings and quantities.
  • Cable, distribution and earthing items included in the contract.
  • Specified MV/LV, transformer and factory connection interfaces.
  • Coordination of specialist inspections and handover records within scope.

Outside this package

  • Full solar EPC responsibility, project development or financing.
  • PV module mounting, roof structure and DC installation unless separately approved.
  • BESS infrastructure, energy-yield guarantees or financial return promises.
  • Unverified design approval, protection settings approval or utility switching authority.

Electrical protection, metering, operating arrangements and connection approvals remain with the responsible project parties. Their requirements must be resolved in the design and work package; QuangAnhcons does not promise grid acceptance or an energisation date.

From inputs to handover

A clear route through the work

  1. Share the electrical basisSLD, AC layout, BOQ, inverter interfaces and factory connection point.
  2. Agree the demarcationConfirm terminals, supply split, roof/access conditions and outage requirements.
  3. Approve the packageConfirm scope, resources, specialist responsibilities and inspection criteria.
  4. Execute the AC worksInstall the contracted items with records of materials and inspections.
  5. Coordinate the handoverResolve agreed punch items and hand over files for authorised testing and connection.

Working with your team

Responsibilities stay visible

QuangAnhcons

Undertakes the defined AC installation and contracted MV/LV interface works.

Owner / EPC team

The developer/EPC confirms the system design and package boundaries; the owner/operator approves site access and operational arrangements.

Design consultants

Resolve design questions and retain responsibility for their design decisions and approvals.

Specialists / site operator

Design, protection, testing and utility parties retain technical approval and operational responsibilities within their appointments.

Technical contact

Nguyen Quoc Hoang

Director of QuangAnhcons. His professional experience includes industrial electrical and MV/LV implementation, quantities, material coordination and testing/handover coordination.

Project roles and available resources are confirmed in each proposal. References identify the actual work scope and responsible entity.

Transformer delivery by crane truck at an industrial electrical project
Transformer delivery from QuangAnhcons' substation and connection project media.

Related delivery experience

The substation interface is part of the electrical discussion

QuangAnhcons' project media includes transformer delivery and substation work associated with a solar connection project. This supports a discussion of equipment access and electrical interfaces; it is not a claim that QuangAnhcons delivered the entire PV plant.

Discuss a comparable scope ↗

Watch QuangAnhcons project footage

From QuangAnhcons’ YouTube channel. Open on YouTube ↗

Before you enquire

Questions from project teams

Raise assumptions early so the proposal reflects your actual package.

Does electrical BoP include the PV panels and DC installation?

Not on this page. The starting scope is AC electrical works. DC, modules, roof works and additional responsibilities require a separate approved scope.

Where does your package start and end?

At terminals and interfaces agreed on the SLD and responsibility matrix. The proposal lists cable sections, boards, earthing and any substation items included.

Can the solar EPC supply all major equipment?

Yes, subject to agreed technical information, delivery, storage, installation and warranty interfaces.

Can you guarantee generation or project payback?

No generation or financial return guarantee forms part of this construction package. Performance obligations must be allocated through the project design and relevant equipment/contracts.

What if the factory requires a shutdown for connection?

The operator must authorise the operating plan and timing. The work package needs an agreed method, isolation boundary and responsible switching parties before execution.

Project enquiry

Send the AC scope
and factory connection point.

Include the SLD, BOQ and target programme so the package boundaries can be reviewed.

Business enquiries: sales@quanganhcgte.com
Alternative: xaylapdienquanganh@gmail.com

  • Company & contactName, role and reply details
  • Project & locationSite and current stage
  • Electrical scopeWorks and interfaces to review
  • Required timingTarget enquiry or mobilisation date

Have an SLD, layout or BOQ? List the files and revisions available. We can agree confidentiality requirements and a suitable sharing channel before exchanging detailed documents.

QUANGANHCONS · SOLAR EPC

Choose Solar & storage for your property

From electricity needs to a preliminary system and budget. No contact details required.

Technical settings & supply scope

Preliminary defaults are selected. Adjust the roof, equipment, connection and cable routes here.

Battery energy storage (optional)

Capacity is rounded to whole modules/cabinets. Backup defaults: SOC 90% to 10%, SOH 90%, discharge efficiency 95%, power derating 10%. Adjust these assumptions through the assistant when data is available. Backup is priced separately; compatibility and transfer time remain unverified.

Scope and budget basis

Preliminary quantities and rates follow the entered configuration and require survey/design confirmation. Basic scope includes standard rails, clamps and module attachments on a suitable existing structure. Select raised frames, foundations, reinforcement, storage or a new transformer to price additions.

Roof height is measured from ground; rack clearance is separate, above the roof/ground surface. Area and row pitch are layout estimates, not approved drawings or wind, structural, waterproofing or fire assessments. VAT follows the quote configuration and requires contract/invoice confirmation.

Automatic pre-survey calculations

Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.

Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.

Solar 8.21.0 · QAC-UI-QUOTE 1.1.1

© 2026 QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED. Quotation prepared by QuangAnhcons. Please retain the issuer name and reference when saving or sharing. Third-party names and materials belong to their respective owners.

Quick substation quotation

Loading the tool…