1. Introduction
As rooftop solar energy becomes a strategic investment for factories and industrial parks across Vietnam, ensuring quality labor is critical to project success. At Quanganhcons, we specialize in end-to-end labor solutions for rooftop solar systems with full compliance, high safety standards, and timely delivery.
2. Project Overview
System Type: Rooftop Solar PV
Capacity: ~1MWp (1036.89 kWp / 815 kWac)
Location: Example Project – Vietnam
Project Duration: 1.5 months
Total Labor Cost: 1.2 Billion VND (~47,000 USD)
Scope: 100% labor work (material excluded)
3. Full Scope of Labor Categories
3.1. Main Component Installation
Mounting 1,686 solar panels (TCL 615Wp)
Installing stainless steel drainage clamps
Mounting and connecting 8 Huawei inverters (100–115kW)
Assembling inverter room structure with HDG steel
3.2. AC Distribution Panel Setup
Installing main AC Distribution Panel (Form 2B, IP54, outdoor)
Installing Sub-panel (1600A, Form 2B, IP41, indoor)
3.3. DC/AC Cable Pulling & Termination
Laying DC cable 1x6mm² from PV modules to inverters
Constructing earthing pits and laying copper ground rods
Cadweld exothermic welding for connections
Installing inverter and roof bonding boxes
4. Human Resource Allocation
Task
Required Workforce
Panel Installation
Mechanical technicians, general workers
Inverter Setup
Licensed electricians
Cable Works
Electrical cable team with system reading skills
Frame & Concrete Works
Welders, rebar workers, concrete team
Cable Tray & Ladder
Light installation workers
Termination & Earthing
Intermediate-to-senior electricians
Water System
Plumbing and mechanical helpers
Monitoring & Control
Electrical automation technicians
Lightning Protection
Certified grounding electricians
General Support
Helpers & cleaning staff
5. Timeline & Pricing
Total Labor Cost: 1.2 Billion VND (approximately 47,000 USD)
Estimated Completion Time: 1.5 months (if materials are available)
Team Size: Minimum of 10 workers, including:
1 Project Supervisor / Technical Manager
2 Specialized Teams (Electrical & Structural)
1 General Support Team
6. Why Choose Quanganhcons?
✅ Over a decade of experience in solar EPC and industrial construction
✅ Proven success with FDI clients across Vietnam
✅ Local team familiar with regional conditions & codes
✅ Focus on on-time, on-budget delivery
✅ Strong safety and documentation practices
Need a trusted labor partner for your solar project in Vietnam?
Contact Quanganhcons today: Hotline: +84 919 758 191 | Email: sales@quanganhcgte.com
[contact-form-7 id="7239967" title="Contact form 1"]
Related Posts
Solar Generation Guarantees: Weather, Availability and Meter Boundaries
Compare solar generation guarantees using an explicit weather basis, availability rules and meter boundary. Use [...]
Rooftop Solar Feasibility Data for an FDI Factory in Vietnam
An owner-focused data pack for factory rooftop solar feasibility in Vietnam: roof, interval load, PCC, [...]
Oct
Labor Cost for 1MWp Rooftop Solar Installation in Vietnam – Quanganhcons
Get a full-scope labor quote for 1MWp rooftop solar installation in Vietnam. All 9 categories [...]
Jul
Decree 80/2024/ND-CP – A New Chapter in Vietnam’s Renewable Energy Policies
1. Overview of Decree 80/2024/ND-CP Decree 80/2024/ND-CP lays the foundation for Vietnam’s renewable energy development, [...]
Jan
Renewable Energy DPPA – A Green Revolution in Vietnam
1. What is Renewable Energy DPPA? The Renewable Energy Direct Power Purchase Agreement (DPPA) allows [...]
Jan
Vietnam Competitive Electricity Market – A Catalyst for Green Energy
1. What is the Vietnam Competitive Electricity Market? The Vietnam Competitive Electricity Market (VCEM) is [...]
Jan
Direct Electricity Sales in Vietnam – A New Era of Energy Freedom
1. What are Direct Electricity Sales in Vietnam? Direct electricity sales allow businesses to purchase [...]
Jan
Renewable Energy Developers Vietnam – Leading the Green Revolution
1. Who Are Renewable Energy Developers in Vietnam? Renewable energy developers in Vietnam are entities [...]
Jan
Large Electricity Consumers Vietnam – Driving the Transition to Green Energy
1. Who Are Large Electricity Consumers in Vietnam? Large electricity consumers in Vietnam are businesses [...]
Jan
DPPA Regulations Vietnam – A Pathway to Sustainable Energy
1. Overview of DPPA Regulations in Vietnam Direct Power Purchase Agreement (DPPA) regulations in Vietnam [...]
Jan
Vietnam Energy Policy Updates – Advancing Renewable Energy Goals
1. Overview of Vietnam’s Energy Policy Updates Vietnam’s energy policies have seen significant advancements, focusing [...]
Jan
DPPA Mechanism Vietnam – Unlocking Renewable Energy Potential
1. What is the DPPA Mechanism in Vietnam? The Direct Power Purchase Agreement (DPPA) mechanism [...]
Jan
Direct Power Purchase Agreement Vietnam – Transforming Energy Markets
1. What is the Direct Power Purchase Agreement in Vietnam? The Direct Power Purchase Agreement [...]
Jan