Choose Solar & storage for your property
From electricity needs to a preliminary system and budget. No contact details required.
Automatic pre-survey calculations
Enter your sizing input to see module area, access area, roof requirement, module mass, capacity and electrical configuration.
Developed and operated by QuangAnhcons. Preliminary results require site survey and written confirmation before ordering or construction.
Solar 8.21.0 · QAC-UI-QUOTE 1.1.1
© 2026 QUANG ANH CONSTRUCTION ELECTRICITY COMPANY LIMITED. Quotation prepared by QuangAnhcons. Please retain the issuer name and reference when saving or sharing. Third-party names and materials belong to their respective owners.
Labor Cost for Rooftop Solar Installation (1MWp) in Vietnam – Full Scope Quotation by Quanganhcons
Contact:
- Hotline: +84 919 758 191
- Email: sales@quanganhcgte.com
- Website: quanganhcgte.com
Table of Contents
- Introduction
- Project Overview
- Full Scope of Labor Categories
3.1. Main Component Installation
3.2. AC Distribution Panel Setup
3.3. DC/AC Cable Pulling & Termination
3.4. Cable Tray & Ladder Installation
3.5. Mounting System (Frame & Foundation)
3.6. Water System for Module Cleaning
3.7. Zero Export Control System
3.8. Weather Monitoring Station
3.9. Grounding & Lightning Protection - Human Resource Allocation
- Timeline & Pricing
- Why Choose Quanganhcons
1. Introduction

As rooftop solar energy becomes a strategic investment for factories and industrial parks across Vietnam, ensuring quality labor is critical to project success. At Quanganhcons, we specialize in end-to-end labor solutions for rooftop solar systems with full compliance, high safety standards, and timely delivery.
2. Project Overview

- System Type: Rooftop Solar PV
- Capacity: ~1MWp (1036.89 kWp / 815 kWac)
- Location: Example Project – Vietnam
- Project Duration: 1.5 months
- Total Labor Cost: 1.2 Billion VND (~47,000 USD)
- Scope: 100% labor work (material excluded)
3. Full Scope of Labor Categories

3.1. Main Component Installation
- Mounting 1,686 solar panels (TCL 615Wp)
- Installing stainless steel drainage clamps
- Mounting and connecting 8 Huawei inverters (100–115kW)
- Assembling inverter room structure with HDG steel
3.2. AC Distribution Panel Setup
- Installing main AC Distribution Panel (Form 2B, IP54, outdoor)
- Installing Sub-panel (1600A, Form 2B, IP41, indoor)
3.3. DC/AC Cable Pulling & Termination
- Laying DC cable 1x6mm² from PV modules to inverters
- MC4 connectors, cable ties, electrical tapes, terminations
- Laying AC cable from inverters to MSB
- Grounding cable installation from structures and inverters to earth pits
3.4. Cable Tray & Ladder Installation
- DC cable trays (W100–W300) from rooftop to inverters
- AC trays and ladders (W300–W1000) indoors & outdoors
- Accessories: elbows, T-joints, vertical bends, brackets, threaded rods, HDG steel fittings
- Cable supports: unistrut, C-channel steel, and clamps
3.5. Mounting System (Frame & Foundation)
- Constructing new concrete pedestals on flat roof
- Mounting steel structures: 80x80x4mm box columns, unistruts, crossbars
- Bolting mid clamps, end clamps, and bonding components
- Installing grounding lugs and earthing clips
3.6. Water System for Module Cleaning
- Installing HDPE piping DN40 & DN20
- Copper ball valves DN20
- Booster pump (2kW)
- Stainless steel water tank (1,000L)
- Control panel for water system
3.7. Zero Export Control System
- Installing Huawei SmartLogger 3000
- Monitoring panel with digital meters (PM5320)
- Current transformers (3xMCT 3200A/5A)
- Control cables, RS485, and conduits
3.8. Weather Monitoring Station
- PVmet 100 station: irradiance, panel temp, ambient temp
- Industrial 4G router + 2-year subscription
- Accessories: data wiring and protection conduits
3.9. Grounding & Lightning Protection
- Constructing earthing pits and laying copper ground rods
- Cadweld exothermic welding for connections
- Installing inverter and roof bonding boxes
4. Human Resource Allocation

| Task | Required Workforce |
|---|---|
| Panel Installation | Mechanical technicians, general workers |
| Inverter Setup | Licensed electricians |
| Cable Works | Electrical cable team with system reading skills |
| Frame & Concrete Works | Welders, rebar workers, concrete team |
| Cable Tray & Ladder | Light installation workers |
| Termination & Earthing | Intermediate-to-senior electricians |
| Water System | Plumbing and mechanical helpers |
| Monitoring & Control | Electrical automation technicians |
| Lightning Protection | Certified grounding electricians |
| General Support | Helpers & cleaning staff |
5. Timeline & Pricing

- Total Labor Cost: 1.2 Billion VND (approximately 47,000 USD)
- Estimated Completion Time: 1.5 months (if materials are available)
- Team Size: Minimum of 10 workers, including:
- 1 Project Supervisor / Technical Manager
- 2 Specialized Teams (Electrical & Structural)
- 1 General Support Team
6. Why Choose Quanganhcons?

✅ Over a decade of experience in solar EPC and industrial construction
✅ Proven success with FDI clients across Vietnam
✅ Local team familiar with regional conditions & codes
✅ Focus on on-time, on-budget delivery
✅ Strong safety and documentation practices
Need a trusted labor partner for your solar project in Vietnam?
Contact Quanganhcons today:
Hotline: +84 919 758 191 | Email: sales@quanganhcgte.com
[contact-form-7 id="7239967" title="Contact form 1"]
Quick substation quotation
Loading the tool…
Multi-station and feeder project
Loading the tool…



Related Posts
Solar Generation Guarantees: Weather, Availability and Meter Boundaries
Compare solar generation guarantees using an explicit weather basis, availability rules and meter boundary. Use [...]
Rooftop Solar Feasibility Data for an FDI Factory in Vietnam
An owner-focused data pack for factory rooftop solar feasibility in Vietnam: roof, interval load, PCC, [...]
Oct
Labor Cost for 1MWp Rooftop Solar Installation in Vietnam – Quanganhcons
Get a full-scope labor quote for 1MWp rooftop solar installation in Vietnam. All 9 categories [...]
Jul
Decree 80/2024/ND-CP – A New Chapter in Vietnam’s Renewable Energy Policies
1. Overview of Decree 80/2024/ND-CP Decree 80/2024/ND-CP lays the foundation for Vietnam’s renewable energy development, [...]
Jan
Renewable Energy DPPA – A Green Revolution in Vietnam
1. What is Renewable Energy DPPA? The Renewable Energy Direct Power Purchase Agreement (DPPA) allows [...]
Jan
Vietnam Competitive Electricity Market – A Catalyst for Green Energy
1. What is the Vietnam Competitive Electricity Market? The Vietnam Competitive Electricity Market (VCEM) is [...]
Jan
Direct Electricity Sales in Vietnam – A New Era of Energy Freedom
1. What are Direct Electricity Sales in Vietnam? Direct electricity sales allow businesses to purchase [...]
Jan
Renewable Energy Developers Vietnam – Leading the Green Revolution
1. Who Are Renewable Energy Developers in Vietnam? Renewable energy developers in Vietnam are entities [...]
Jan
Large Electricity Consumers Vietnam – Driving the Transition to Green Energy
1. Who Are Large Electricity Consumers in Vietnam? Large electricity consumers in Vietnam are businesses [...]
Jan
DPPA Regulations Vietnam – A Pathway to Sustainable Energy
1. Overview of DPPA Regulations in Vietnam Direct Power Purchase Agreement (DPPA) regulations in Vietnam [...]
Jan
Vietnam Energy Policy Updates – Advancing Renewable Energy Goals
1. Overview of Vietnam’s Energy Policy Updates Vietnam’s energy policies have seen significant advancements, focusing [...]
Jan
DPPA Mechanism Vietnam – Unlocking Renewable Energy Potential
1. What is the DPPA Mechanism in Vietnam? The Direct Power Purchase Agreement (DPPA) mechanism [...]
Jan
Direct Power Purchase Agreement Vietnam – Transforming Energy Markets
1. What is the Direct Power Purchase Agreement in Vietnam? The Direct Power Purchase Agreement [...]
Jan