The cost of the construction process for a 160kVA substation in building a fast-charging EV station in Vietnam

The 160kVA Transformer Station: Powering Up High-Speed EV Charging

In the quest to electrify transportation, establishing a robust electrical infrastructure is paramount. The construction of a 160kVA transformer station is a critical step in this journey, especially when it comes to high-speed charging for electric vehicles. With a substantial 22.2% of the project’s total value dedicated to this component, we delve into the significance of this investment.

The Lattice of Power

Central to the station is the lattice-style setup, where the transformer, supported by a steel frame, is strategically placed between two towering centrifuged concrete poles. At under 40 meters from the 22kV connection point, the station is an epitome of strategic engineering, ensuring efficiency in energy transmission and access.

Comprehensive Coverage

From the foundation’s first pour to the final energizing, every phase of the transformer station’s construction is meticulously planned and executed. Incorporating state-of-the-art materials and implementing compartments for both MCCB 3P 250A and reactive power compensation, the station promises reliability and safety.

Investing in Sustainability

The budgeted cost of $18,583 USD mirrors our dedication to building not just for the present but for a sustainable future. This transformer station isn’t merely a construction project; it’s a cornerstone in the landscape of clean transportation.

For comprehensive insights on our construction process and how Quanganhcons is revolutionizing EV charging infrastructures, reach out to us. We’re not just building stations; we’re powering the sustainable transport of tomorrow.

The prices indicated for the 60kW DC fast chargers are for reference purposes only. The actual cost will depend on the specific design of the charging station as well as the materials and equipment utilized in the project. For a detailed quote tailored to your unique requirements, please reach out to us via our quote request form or call our hotline for personalized advice.

For more insights and details on how we can help realize your EV infrastructure project, reach out to us at (+84) 9 1975 8191.

    Related Posts

    Leave a Reply

    Your email address will not be published. Required fields are marked *