Labor Cost for 1MWp Rooftop Solar Installation in Vietnam – Quanganhcons

Labor Cost for Rooftop Solar Installation (1MWp) in Vietnam – Full Scope Quotation by Quanganhcons

Contact:


Table of Contents

  1. Introduction
  2. Project Overview
  3. Full Scope of Labor Categories
    3.1. Main Component Installation
    3.2. AC Distribution Panel Setup
    3.3. DC/AC Cable Pulling & Termination
    3.4. Cable Tray & Ladder Installation
    3.5. Mounting System (Frame & Foundation)
    3.6. Water System for Module Cleaning
    3.7. Zero Export Control System
    3.8. Weather Monitoring Station
    3.9. Grounding & Lightning Protection
  4. Human Resource Allocation
  5. Timeline & Pricing
  6. Why Choose Quanganhcons

1. Introduction

 

rooftop solar installation labor cost Vietnam

As rooftop solar energy becomes a strategic investment for factories and industrial parks across Vietnam, ensuring quality labor is critical to project success. At Quanganhcons, we specialize in end-to-end labor solutions for rooftop solar systems with full compliance, high safety standards, and timely delivery.


2. Project Overview

rooftop solar installation labor cost Vietnam

  • System Type: Rooftop Solar PV
  • Capacity: ~1MWp (1036.89 kWp / 815 kWac)
  • Location: Example Project –  Vietnam
  • Project Duration: 1.5 months
  • Total Labor Cost: 1.2 Billion VND (~47,000 USD)
  • Scope: 100% labor work (material excluded)

3. Full Scope of Labor Categories

rooftop solar installation labor cost Vietnam

3.1. Main Component Installation

  • Mounting 1,686 solar panels (TCL 615Wp)
  • Installing stainless steel drainage clamps
  • Mounting and connecting 8 Huawei inverters (100–115kW)
  • Assembling inverter room structure with HDG steel

3.2. AC Distribution Panel Setup

  • Installing main AC Distribution Panel (Form 2B, IP54, outdoor)
  • Installing Sub-panel (1600A, Form 2B, IP41, indoor)

3.3. DC/AC Cable Pulling & Termination

  • Laying DC cable 1x6mm² from PV modules to inverters
  • MC4 connectors, cable ties, electrical tapes, terminations
  • Laying AC cable from inverters to MSB
  • Grounding cable installation from structures and inverters to earth pits

3.4. Cable Tray & Ladder Installation

  • DC cable trays (W100–W300) from rooftop to inverters
  • AC trays and ladders (W300–W1000) indoors & outdoors
  • Accessories: elbows, T-joints, vertical bends, brackets, threaded rods, HDG steel fittings
  • Cable supports: unistrut, C-channel steel, and clamps

3.5. Mounting System (Frame & Foundation)

  • Constructing new concrete pedestals on flat roof
  • Mounting steel structures: 80x80x4mm box columns, unistruts, crossbars
  • Bolting mid clamps, end clamps, and bonding components
  • Installing grounding lugs and earthing clips

3.6. Water System for Module Cleaning

  • Installing HDPE piping DN40 & DN20
  • Copper ball valves DN20
  • Booster pump (2kW)
  • Stainless steel water tank (1,000L)
  • Control panel for water system

3.7. Zero Export Control System

  • Installing Huawei SmartLogger 3000
  • Monitoring panel with digital meters (PM5320)
  • Current transformers (3xMCT 3200A/5A)
  • Control cables, RS485, and conduits

3.8. Weather Monitoring Station

  • PVmet 100 station: irradiance, panel temp, ambient temp
  • Industrial 4G router + 2-year subscription
  • Accessories: data wiring and protection conduits

3.9. Grounding & Lightning Protection

  • Constructing earthing pits and laying copper ground rods
  • Cadweld exothermic welding for connections
  • Installing inverter and roof bonding boxes

4. Human Resource Allocation

rooftop solar installation labor cost Vietnam

Task Required Workforce
Panel Installation Mechanical technicians, general workers
Inverter Setup Licensed electricians
Cable Works Electrical cable team with system reading skills
Frame & Concrete Works Welders, rebar workers, concrete team
Cable Tray & Ladder Light installation workers
Termination & Earthing Intermediate-to-senior electricians
Water System Plumbing and mechanical helpers
Monitoring & Control Electrical automation technicians
Lightning Protection Certified grounding electricians
General Support Helpers & cleaning staff

5. Timeline & Pricing

rooftop solar installation labor cost Vietnam

  • Total Labor Cost: 1.2 Billion VND (approximately 47,000 USD)
  • Estimated Completion Time: 1.5 months (if materials are available)
  • Team Size: Minimum of 10 workers, including:
    • 1 Project Supervisor / Technical Manager
    • 2 Specialized Teams (Electrical & Structural)
    • 1 General Support Team

6. Why Choose Quanganhcons?

rooftop solar installation labor cost Vietnam

✅ Over a decade of experience in solar EPC and industrial construction
✅ Proven success with FDI clients across Vietnam
✅ Local team familiar with regional conditions & codes
✅ Focus on on-time, on-budget delivery
✅ Strong safety and documentation practices

Need a trusted labor partner for your solar project in Vietnam?
Contact Quanganhcons today:
Hotline: +84 919 758 191 | Email: sales@quanganhcgte.com

 