Constructing a large-scale transformer station such as the 3000KVA – 22/0.4KV is a significant project that necessitates meticulous planning, precision engineering, and substantial investment. This comprehensive guide aims to give prospective clients and partners a thorough understanding of the costs, procedures, timelines, and specifications involved in building a turnkey transformer station with QuangAnhcons, a leading contractor in Vietnam. With an unwavering commitment to quality and customer satisfaction, QuangAnhcons ensures that every aspect of the project meets the highest standards of reliability and efficiency.
Detailed Construction Estimate
The total project is carefully categorized into different sections, reflecting a detailed construction estimate as follows:
a. 22KV Transmission Line (14.71% of the total cost)
- Key Materials: High-voltage poles, insulators, covered cables, and specific line accessories such as reclosers and power supply transformers.
- Labor: Includes full package labor cost.
- 14m High-Voltage Transmission Line Pole
- Iron Crossarm L2200x75x75x8mm/Zn
- Crossarm Brace 60x6x920
- 24Kv Standoff Insulator + Rod
- 24Kv Polymer Suspension Insulator
- AXV 50mm2 Covered Cable: Phase Wire
- Bare AC 25mm2 Cable: Ground Wire
- CXV 25mm2 Covered Cable: Phase Wire
- “Recloser 3P 27kV 630A 16kA/3s
- Include:
- NOVA 27i
- FDX control panel, connection acessories”
- Power supply transformer for recloser 1P 12,7/0,23kV – 1000VA
- DS 3P- 630A – 24kV-150 kV BIL, OD, Polymer, install on 1 pole
- LBFCO 200A-24kV Polymer + Base
- LA 18KV 10KA Polymer + Base
- TU, TI
- Medium Voltage TU, TI Support (H, V50 frame)
- 3P 4 Wire 120/60V – 5A Electronic Meter
- Cu/XLPE/PVC 4Cx25mm2 Cable – 0.6/1kV
- Composite Electric Meter Box Size H500 x W300 x D200
- Grounding for Line Section
- Pole Foundation
- Line Section Testing
- Line Section Accessories: Hotline Clamp 2/0 (50-70), Insulator Cap, Grip Clip, Cable Lug, Mid/Low Voltage Tape, Bolts, LA Cover, LBFCO…
- Labor Cost Calculated as a Package
b. Part Substation 3000KVA – 22/0.4KV Materials (80.94% of the total cost)
- Components: High-voltage poles, composite crossarms, insulators, substation platform, grounding systems, cables, and various installation accessories.
- Labor: Labor cost calculated as a complete package.
- 14m High-Voltage Transmission Line Pole
- Composite Crossarm 2400x75x75x6mm + Brace: LBFCO
- Iron Crossarm L2400x75x75x8mm/Zn + Brace
- 24kV Standoff Polymer Insulator DR600 + Non-Lead Covered Rod
- Low Voltage Cable Support
- Substation Platform and Fence
- Substation Grounding
- Line Accessories: Insulator Cap, Cable Lug, Mid/Low Voltage Tape, Bolts, LA Cover, LBFCO, LBFCO Nameplate, Pole Nameplate, Station Nameplate, No Climbing Sign…
- Pole Foundation
- 24KV C/XLPE/PVC 25mm2 Covered Cable
- CV/600V-300mm2 Cable from MBA – 8 Strands/Phase
- CV/600V-300mm2 Cable from MBA – Neutral Wire 4 Strands/Ground
- Cu300mm2 Cable Lug
- 3 Phase oil transfomer 3200KVA- 22/0.4KV
- LBFCO 200A-24kV Polymer + Base
- LA 18KV 10KA
- MSB Cabinet (ACB + reactive power compensation) Double Doort
- ACB 3P 4000A 85KA Fixed Type
- Reactive power compensation 1600Kvar
- Equipment Testing
- Labor Cost Calculated as a Package
c. Other Costs (4.35% of the total cost)
- Expenses: Include design and assessment, supervision, power cut connection fee, and commissioning test fees.
- Design and Assessment Costs
- Supervision Costs
- Power Cut Connection Fee
- Commissioning Test Fee
- Approval Documentation for Substation Installation, Completion
- Construction Machinery & Material, Equipment Transport Cost
Main Work Content
- Documentation and Planning: Preparation of all required documentation, ensuring compliance with Vietnamese electrical standards.
- Installation and Construction: Full construction of the 3000KVA substation, including advanced metering and switchboard installation.
- Timeline: Total project preparation and construction are expected to take 60 days.
Customers can discover a comprehensive list of materials, equipment, and their corresponding technical specifications for each aspect of the substation construction cost, detailed in the article attached to this video.
Construction Leadership by the Contractor with Documentation Support from the Investor
In the development of the transformer station, the contractor is tasked with overseeing all facets of the project, demonstrating expertise in compliance with electrical regulations and collaborative efforts with energy authorities. The investor simplifies their participation by supplying essential legal documentation, including land ownership certificates, necessary permits, and valid identification, each notarized and up-to-date. From the initial stages through to the finalization of the project, the contractor is dedicated to managing design, grid connection, and execution, all within a strategically scheduled 60-day timeline. This includes 45 days dedicated to preparation and 15 days of intensive construction
Financial Stages in Building a Transformer Station: Coordination Between Contractor and Investor
The payment structure for constructing a transformer station is divided into three distinct phases. The first payment occurs right after the contract is signed, providing the contractor with the funds necessary to begin the procurement and delivery of materials and equipment to the site. The second payment is made when the contractor notifies the investor of the delivery of the transformer, which then proceeds with its installation and initial operational steps. The final stage of the financial agreement culminates with the last payment, which is made once the transformer station is fully energized and all testing, undertaken jointly by the contractor and investor, has been successfully completed.
Client Support and Warranty Guarantee
After construction is completed, clients benefit from a one-year warranty, which reinforces the dependability of the project and bolsters their trust in its operational functionality.
Dedication to Customer Satisfaction and Upholding High Standards
Our commitment to maintaining high-quality standards and transparent pricing forms the foundation of our customer service promise. With extensive experience in building transformer stations, we ensure satisfaction in every project. Our expert team is ready around the clock to address any questions or provide necessary support. For tailored advice and a precise estimate on a 3000kVA 22/0.4kV transformer station, please reach out using the contact details we have shared. We are fully prepared to guide you through the planning and cost assessment phases and to help navigate all associated legal requirements for a seamless and effective construction project.
Partner with Us for Tailored Project Solutions
Selecting QuangAnhcons to develop your 3000kVA – 22/0.4KV substation goes beyond a simple project decision; it represents a dedication to enhancing power efficiency, bolstering system reliability, and fostering economic growth. Our commitment to clear pricing, superior service, and technical expertise ensures that collaborating with us will pave the way for outstanding advancements in the energy sector.
“Engaging QuangAnhcons means dedicating to a 3000kVA – 22/0.4KV transformer project that is not just efficient but also economically advantageous. For further guidance, please reach out to us through our hotline at (+84) 9 1975 8191.”
Please Note: All provided figures are estimations and may vary based on site conditions and market variables. Our direct communication channels are open for real-time updates and custom solutions.
Quang Anh CE Co.,LTD
- Hotline: (+84) 9 1975 8191
- Email: project@quanganhcons.com
- Address:Unit 02, 08th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City
- Business Hours: Monday to Friday, from 8:00 am to 5:00 pm
Related Posts
Building a 7500KVA Substation: Costs, Timeline, and Project Management Insights
Building a 7500KVA – 22/0.4KV transformer substation requires intricate planning, specialized knowledge in electrical systems, [...]
Jun
Step-by-Step Costs for Constructing a 5000KVA Transformer Substation
Building a 5000KVA – 22/0.4KV transformer substation in Vietnam requires careful planning, deep expertise in [...]
Jun
Key Insights into Constructing a 4000KVA – 22/0.4KV Transformer Substation: Costs, Timeline, and Expertise
Constructing a transformer station is a pivotal task that demands meticulous planning, a robust understanding [...]
Jun
Investment Analysis for a 3200kVA Substation: Comprehensive Guide on Costs and Construction Timeline
The construction of a 3200kVA – 22/0.4kV substation is a sophisticated and detailed process that [...]
Jun
Key Steps and Costs in Building a 3000KVA – 22/0.4KV Substation
Constructing a large-scale transformer station such as the 3000KVA – 22/0.4KV is a significant project [...]
Jun
Detailed Pricing Guide for a 2500kVA Transformer Station Project
Comprehensive Guide to Constructing a 2500KVA Transformer Station in Vietnam Constructing a transformer station in [...]
Jun
How much is the full construction cost for a 1600kVA substation?
Constructing a transformer station is a technologically demanding endeavor that requires a deep understanding of [...]
Apr
What is the total construction price for a 2000kVA transformer substatation in Vietnam?
Comprehensive Guide to 2000kVA Substation Construction Costs in Vietnam 1.Detailed Costs Breakdown In the quest [...]
Apr
What is the total construction price for a 1500kVA substation in Vietnam?
Ensuring Quality and Compliance in Substation Construction Quality assurance and regulatory compliance are pillars of [...]
Apr
How much does it cost to build a complete 1250kVA substation in Vietnam?
The journey to erecting a transformer station is filled with intricate steps and rigorous standards. [...]
Apr
What is the all-inclusive construction cost for a 1000kVA transformer station in Vietnam?
Understanding the financial aspects of constructing a transformer station is crucial for any successful project. [...]
Apr
What is the total price for constructing an all-inclusive 800kVA substation in Vietnam?
Embarking on the construction of a 800kVA – 22/0.4KV substation requires a blend of detailed [...]
Apr
750kVA Substation – How much is the construction cost in Vietnam?
Constructing a transformer station is a complex and significant undertaking that requires careful planning, precision, [...]
Mar
How much is the total cost for constructing a 630kVA transformer station in Vietnam?
In the context where energy plays a pivotal role in socio-economic development and the demand [...]
Mar
Expert Construction of 560kVA Substations – Enhancing Electrical Distribution
As economies grow and the fabric of society becomes increasingly dependent on reliable energy, the [...]
Mar
How much does it cost to construct a 400kVA substation in Vietnam?
In an era where uninterrupted power supply forms the backbone of technological and economic advancements, [...]
Mar
Comprehensive Guide to 320kVA – 22/0.4KV Substation Construction
The necessity for a resilient and efficient power distribution system is ever-increasing in today’s fast-paced [...]
Mar
Comprehensive Guide to Constructing a 250kVA – 22/0.4kV Substation
In the quest to meet the growing demand for electricity in a sustainable and reliable [...]
Mar
Expert 180kVA – 22/0.4kV Substation Construction Services | Quang Anh CE
Addressing the critical need for dependable and efficient energy distribution, the project to introduce a [...]
Mar
How much does it cost to construct a 160KVA – 22/0.4kV substation in Vietnam?
The dynamic demand for stable and efficient electricity underscores the importance of enhancing the grid [...]
Mar