In an era where energy demands are surging and reliance on efficient electrical infrastructures is paramount, Quanganhcons has successfully completed an exemplary project at the Jia Bao Rui Factory, located in the Bau Bang Industrial Zone, Lai Uyen District, Binh Duong Province. This initiative, characterized by its innovation and the application of cutting-edge technology, not only serves the industrial needs but also aligns with environmental sustainability goals.
The centerpiece of this project involves the development of both overhead and underground medium voltage lines at 22kV, complemented by the establishment of two transformer stations with impressive capacities of 1250kVA and 2500kVA.
A hallmark of this project is the adoption of state-of-the-art electrical solutions including DS 3-phase 630A 24kV protection equipment and Recloser 24KV- 630A -12.5KA/3S devices, enhancing system efficiency while ensuring utmost safety and energy conservation. The project utilizes high-performance Thibidi and oil type transformers, alongside main electrical panels equipped with ACB and capacitive banks, to elevate the power factor cosfi and streamline energy management and distribution.
This comprehensive endeavor by Quanganhcons not only augments the regional energy infrastructure but also stands as a testament to the firm’s dedication to leveraging advanced technologies and optimizing operational methodologies. Through this, Quanganhcons solidifies its commitment to delivering long-term, sustainable benefits to both the community and the natural environment.
Related Posts
2x2500kVA Transformer Substation for RVN Fibers Successfully Completed
2x2500kVA Transformer Substation Project for RVN Fibers Company – Successfully Completed with High Technical Standards [...]
Jan
Guide to Constructing a 6300KVA – 22/0.4KV Substation: An In-depth Cost and Management Overview
Constructing a 6300KVA – 22/0.4KV transformer substation in Vietnam involves meticulous planning, specialized knowledge in [...]
Jun
160kVA Substation in Lam Dong, Vietnam – Quanganhcons
In the verdant landscapes of Lâm Đồng, amidst April’s seasonal showers, a significant technical endeavor [...]
Mar
Substation Contractor: Garmex Factory’s New 630KVA Transformer Station
In the heart of Hóc Môn District, Ho Chi Minh City, Vietnam a pivotal infrastructure [...]
Mar
Innovative Energy Solutions for Rubber Production: The 400kVA Project by Quanganhcons
Amidst a scenario where the demand for energy plays a pivotal role across numerous sectors, [...]
Mar
Vietnam Substation Contractor: 1000kVA Transformer Station
In the arena of infrastructural advancements, Quanganhcons distinguishes itself by successfully completing the installation of [...]
Mar
Bau Bang Industrial Zone – 1250kVA & 2500kVA Transformer Stations
In an era where energy demands are surging and reliance on efficient electrical infrastructures is [...]
Mar
The 630kVA Transformer Upgrade at Asuzac Factory
In the heart of Thuan An District, Binh Duong, Vietnam, the Vietnam – Singapore Industrial [...]
Mar
2500KVA Transformer Station – Long Hau IDZ – Vietnam FDI
In the context of escalating energy requirements and substantial industrial expansion, the development and effective [...]
Feb
Elevating Urban Aesthetics and Safety through Electrical Upgrades
In the current age of rapid technological advancement and ongoing urban growth, enhancing and modernizing [...]
Feb