Substation Construction & Grid Connection Coordination in Vietnam
Define the substation works, incoming supply interfaces and handover responsibilities before committing to construction.
Scope reviewed against the approved single-line diagram, equipment schedule and connection requirements.

A defined assignment
From an approved substation scope to a coordinated handover
QuangAnhcons reviews construction packages for industrial substations and their MV/LV interfaces. For 22–35 kV enquiries, the actual voltage level, equipment, work limits and specialist requirements are confirmed against project documents before a proposal is issued.
A new factory supply
Clarify the incoming line, substation, LV outgoing connections and the boundary to the factory electrical system.
An EPC electrical package
Allocate civil interfaces, equipment supply, lifting, installation and specialist test responsibilities.
A project nearing energisation
Identify unfinished works, missing records and the parties needed for acceptance and authorised switching.
Outputs to agree
A defined installation and a traceable handover file
The contracted outputs follow the approved design, BOQ, site requirements and acceptance arrangements.
Incoming supply works
The agreed line/cable section and connection interfaces.
Substation installation
Placement and installation of the transformer and MV/LV equipment included in the BOQ.
Earthing and connections
Earthing, bonding and incoming/outgoing terminations within the agreed design.
Work and material records
Inspection records, equipment documents and material receipt information.
Specialist coordination
Test schedule and document coordination with the appointed qualified parties.
Handover readiness
As-built records, punch list and document index for the scope executed.
Agree the boundaries
What the assignment covers
Within the agreed package
- Incoming supply, transformer and MV/LV installation items expressly included in the BOQ.
- Coordination of foundations, equipment access and other agreed construction interfaces.
- Installation records and follow-up of outstanding work.
- Coordination of testing, acceptance and energisation readiness as contracted.
Outside this package
- Unverified design certification, independent supervision or accredited testing authority.
- 110 kV works or BESS infrastructure under this service scope.
- Utility approval, operational switching or a guaranteed energisation date.
- Equipment supply, civil works or lifting omitted from the agreed BOQ.
The utility, industrial park and site operator retain their respective connection and switching authority. Proposed energisation dates depend on completed works, required documents, specialist results and the relevant parties' confirmation.
From inputs to handover
A clear route through the work
- Provide the connection basisSLD, voltage, equipment schedule, supply route and available connection documents.
- Review the interfacesClarify work limits, foundations, access, outage needs and responsible parties.
- Agree the construction packageConfirm BOQ, supply split, resources, specialist scope and acceptance requirements.
- Construct and documentInstall the contracted work and maintain material and inspection records.
- Coordinate readinessClose agreed punch items and assemble records for the authorised acceptance and switching process.
Working with your team
Responsibilities stay visible
QuangAnhcons
Executes the agreed construction scope and coordinates its work records and handover readiness.
Owner / EPC team
Approves the contractual boundaries, provides project documents and coordinates its acceptance responsibilities.
Design consultants
Resolve design questions and retain responsibility for their design decisions and approvals.
Specialists / site operator
Testing bodies, utility/industrial-park representatives and the site operator perform and sign their own authorised work.
Technical contact
Nguyen Quoc Hoang
Director of QuangAnhcons. His professional experience includes industrial electrical and MV/LV implementation, quantities, material coordination and testing/handover coordination.
Project roles and available resources are confirmed in each proposal. References identify the actual work scope and responsible entity.
→ factory interface
Related delivery experience
Practical experience at the substation interface
The photograph and company video show electrical substation construction activity. They provide context for equipment access and work sequencing; the scope for a new project is established from its own SLD, BOQ and connection requirements.
Watch QuangAnhcons project footage
From QuangAnhcons’ YouTube channel. Open on YouTube ↗
Before you enquire
Questions from project teams
Raise assumptions early so the proposal reflects your actual package.
Do you provide a complete substation EPC contract?
This page describes a defined construction and coordination package. Design, supply, civil works and specialist services must each be identified and agreed; a full EPC responsibility is not assumed.
Can you confirm an energisation date in advance?
We can coordinate readiness against a target date. Final acceptance and switching depend on the authorised parties and completion of their prerequisites.
Who signs the test results?
The appointed testing organisation signs its own results. QuangAnhcons can coordinate attendance and collate documents within the agreed scope.
Does equipment supply form part of the package?
Only where listed in the proposal and BOQ. Client-supplied equipment requires agreed delivery, storage, lifting and warranty interfaces.
What do you need to review a 22–35 kV enquiry?
Please provide the SLD, equipment ratings, location, incoming supply route, connection requirements and target programme. We then confirm the work limits and resources.
Project enquiry
Start with the SLD
and connection boundary.
Send the substation scope, location and target programme for a package review.
Business enquiries: sales@quanganhcgte.com
Alternative: xaylapdienquanganh@gmail.com
- Company & contactName, role and reply details
- Project & locationSite and current stage
- Electrical scopeWorks and interfaces to review
- Required timingTarget enquiry or mobilisation date
Have an SLD, layout or BOQ? List the files and revisions available. We can agree confidentiality requirements and a suitable sharing channel before exchanging detailed documents.