Comprehensive Guide to Constructing a 2500KVA Transformer Station in Vietnam
Constructing a transformer station in Vietnam involves meticulous planning, execution, and compliance with technical and legal standards. A 2500KVA – 22/0.4kV transformer station, in particular, serves not just an operational need but significantly contributes to the infrastructural stability of the region. QuangAnhcons, a seasoned contractor in the field, takes the lead on these projects, ensuring high-quality construction and reliable service. In this article, we provide a complete breakdown of the construction costs, detailed materials used, and the overall process, highlighting the expertise and capabilities of QuangAnhcons.
1.Construction Cost Overview
Detailed Cost Breakdown and Material Specifications
a. 22KV Transmission Line
- Materials:
- 14m High-Voltage Transmission Line Poles, Iron Crossarms with specifications L2200x75x75x8mm/Zn, and additional components ensuring robust structural integrity.
- Advanced electrical components such as 24Kv Standoff Insulators, Polymer Suspension Insulators, and high-grade covered cables.
- A state-of-the-art “Recloser 3P 27kV 630A” to maintain circuit continuity and reliability with FDX control panels.
b. 2500KVA Substation – 22/0.4KV
- Substation Setup:
- Core infrastructure includes high-voltage poles and composite crossarms enhanced with modern insulation materials.
- Essential electrical components like the 3 PHASE MBA 2500KVA transformer, LBFCO 200A-24kV bases, and LA 18KV 10KA units.
- Modern control systems housed within MSB Cabinets featuring ACB 3P 4000A and a comprehensive reactive power compensation system.
c. Additional Costs
- Project Management and Compliance:
- This includes design and assessment costs, supervision, and fees associated with power cut connections and commissioning tests.
- Documentation costs for substation installation and completion, as well as transport and handling of construction machinery and materials.
d. Total Investment Overview
2. Project Implementation and Warranty

Timeline:
- The entire project, from ground-breaking to operational handover, is meticulously planned to span a definitive timeline, ensuring that all phases, from laying the foundational poles to the final testing and commissioning, are completed efficiently within the scheduled time frames.
3. Warranty and After-Sales Service:

- QuangAnhcons offers a robust 12-month warranty for the transformer station, underscoring their commitment to quality and customer satisfaction. The warranty covers all components and labor, with an efficient service team ready to address and rectify any issues swiftly.
The construction of a 2500KVA – 22/0.4kV transformer station with QuangAnhcons is an investment in quality and reliability. With transparent pricing, detailed project outlines, and professional execution, QuangAnhcons ensures that each project contributes to the socio-economic development of the area, while providing stable and secure power solutions. For detailed quotations or to discuss your next project, contact QuangAnhcons directly at (+84) 9 1975 8191.
4.Dynamics Between Investor and Contractor in Building Projects
In the highlighted building project, the contractor holds the key role of managing all vital processes that determine the project’s outcome. The investor supports this role by providing the contractor with crucial legal papers, including up-to-date and notarized versions of land ownership documents, business permits, the representative’s identification, and environmental pacts. The contractor is tasked with maintaining up-to-date standards in electrical setups, establishing connections to the electrical grid, and managing the day-to-day operations until the project is fully completed. The project’s timeline is structured into an initial preparation period of 45 days
5.Payment Structure
Three-Stage Payment Plan for Transformer Station Construction
The payment schedule for building the transformer station is thoughtfully organized into three distinct phases. The initial phase kicks off with a payment immediately after the contractual agreement is in place, facilitating the contractor in initiating the transport and installation of necessary materials and equipment. The second stage of payment is prompted by the investor’s receipt notice of the transformer at the construction site, which subsequently allows for the transformer’s final installation and pre-commissioning activities. The concluding payment marks the completion of the energization and detailed testing procedures, jointly overseen by both the investor and the contractor, signifying the project’s fulfillment.
6.Dedication to Excellence and Customer Fulfillment
At the core of our business lies a steadfast dedication to delivering high-quality services at competitive prices, with specialized knowledge in constructing transformer stations. This commitment guarantees our clients’ complete satisfaction. Our support team is accessible around the clock, ready to offer any assistance or information needed. For personalized advice and tailored quotations for your 2500kVA 22/0.4kV transformer station requirements, please contact us. Our skilled team is prepared to assist with project planning, cost estimation, and navigating legal requirements to ensure a seamless construction experience.

7.Personalized Service Experience Invitation
Choosing Quang Anh CE Co., LTD for your 2500kVA – 22/0.4KV substation project offers more than typical construction services; it signifies a profound dedication to enhancing energy efficiency and system reliability, positively impacting the economic environment. We provide transparent pricing, superior service, and unparalleled expertise in the field, ensuring that your project with us establishes new standards in the electrical industry.
Quang Anh CE Co.,LTD
Contact Number: (+84) 9 1975 8191
Email Address: project@quanganhcons.com
Office Location:Unit 02, 08th floor, Pearl Plaza Building, 561A Dien Bien Phu Street, Ward 25, Binh Thanh District, Ho Chi Minh City
Operational Hours: Monday to Friday, from 8:00 am to 5:00 pm.
Please Note: All provided figures are estimations and may vary based on site conditions and market variables. Our direct communication channels are open for real-time updates and custom solutions.
Related Posts
Building a 7500KVA Substation: Costs, Timeline, and Project Management Insights
Building a 7500KVA – 22/0.4KV transformer substation requires intricate planning, specialized knowledge in electrical systems, [...]
Jun
Step-by-Step Costs for Constructing a 5000KVA Transformer Substation
Building a 5000KVA – 22/0.4KV transformer substation in Vietnam requires careful planning, deep expertise in [...]
Jun
Key Insights into Constructing a 4000KVA – 22/0.4KV Transformer Substation: Costs, Timeline, and Expertise
Constructing a transformer station is a pivotal task that demands meticulous planning, a robust understanding [...]
Jun
Investment Analysis for a 3200kVA Substation: Comprehensive Guide on Costs and Construction Timeline
The construction of a 3200kVA – 22/0.4kV substation is a sophisticated and detailed process that [...]
Jun
Key Steps and Costs in Building a 3000KVA – 22/0.4KV Substation
Constructing a large-scale transformer station such as the 3000KVA – 22/0.4KV is a significant project [...]
Jun
Detailed Pricing Guide for a 2500kVA Transformer Station Project
Comprehensive Guide to Constructing a 2500KVA Transformer Station in Vietnam Constructing a transformer station in [...]
Jun
How much is the full construction cost for a 1600kVA substation?
Constructing a transformer station is a technologically demanding endeavor that requires a deep understanding of [...]
Apr
What is the total construction price for a 2000kVA transformer substatation in Vietnam?
Comprehensive Guide to 2000kVA Substation Construction Costs in Vietnam 1.Detailed Costs Breakdown In the quest [...]
Apr
What is the total construction price for a 1500kVA substation in Vietnam?
Ensuring Quality and Compliance in Substation Construction Quality assurance and regulatory compliance are pillars of [...]
Apr
How much does it cost to build a complete 1250kVA substation in Vietnam?
The journey to erecting a transformer station is filled with intricate steps and rigorous standards. [...]
Apr
What is the all-inclusive construction cost for a 1000kVA transformer station in Vietnam?
Understanding the financial aspects of constructing a transformer station is crucial for any successful project. [...]
Apr
What is the total price for constructing an all-inclusive 800kVA substation in Vietnam?
Embarking on the construction of a 800kVA – 22/0.4KV substation requires a blend of detailed [...]
Apr
750kVA Substation – How much is the construction cost in Vietnam?
Constructing a transformer station is a complex and significant undertaking that requires careful planning, precision, [...]
Mar
How much is the total cost for constructing a 630kVA transformer station in Vietnam?
In the context where energy plays a pivotal role in socio-economic development and the demand [...]
Mar
Expert Construction of 560kVA Substations – Enhancing Electrical Distribution
As economies grow and the fabric of society becomes increasingly dependent on reliable energy, the [...]
Mar
How much does it cost to construct a 400kVA substation in Vietnam?
In an era where uninterrupted power supply forms the backbone of technological and economic advancements, [...]
Mar
Comprehensive Guide to 320kVA – 22/0.4KV Substation Construction
The necessity for a resilient and efficient power distribution system is ever-increasing in today’s fast-paced [...]
Mar
Comprehensive Guide to Constructing a 250kVA – 22/0.4kV Substation
In the quest to meet the growing demand for electricity in a sustainable and reliable [...]
Mar
Expert 180kVA – 22/0.4kV Substation Construction Services | Quang Anh CE
Addressing the critical need for dependable and efficient energy distribution, the project to introduce a [...]
Mar
How much does it cost to construct a 160KVA – 22/0.4kV substation in Vietnam?
The dynamic demand for stable and efficient electricity underscores the importance of enhancing the grid [...]
Mar